Table of Contents

Original manual page 3

This is the table of contents as printed in the original manual. Page numbers are the original printed page numbers. The links on this site's contents page follow the same order.

SectionPage
Foreword (printed "Forward")1
Preface2
Table of Contents3
Commissioning Check List6
Maintenance Check List10
Specifications13
Sail Plan14
Spar and Rigging Maintenance15
Rigging Lengths20
Deck Plan21
Mainsheet Arrangement22
Mainsheet Traveler23
Boom Yang (Boom Vang)24
Solid Yang (Solid Vang) and Purchase25
Halyards Arrangement26
Shroud Rigging27
Mast Sub Assembly28
Boom30
Outhaul Assembly31
Electrical 12 Volt DC32
Electrical Plan, DC35
Mast Light Wiring37
Electrical, AC 110/115 Volt38
AC Plan40
115 VAC Wiring Diagram41
230 VAC Wiring Diagram42
Control Panel 230 VAC/12 VDC43
Plumbing45
Plumbing Plan48
Head Plumbing49
Auxiliary Power50
Packing Gland55
Prop Shaft and Log Alignment Procedure56
Shaft Alignment Illustration57
25XP Harness to Seaward Helm Pod58
Steering59
Accommodation60
Accommodations Plan62
LPG Plan63
Decommissioning64
Owner/User Responsibility67
Lightning Protection70
Commissioning Package79
Literature and warranties for equipment, which may be supplied with this manual.80
Equipment and Materials Log81